Project Team Meeting Minutes – Warehouse Modernization Date: 04/09/2026, 9:00–10:30 AM Location: Conference Room A201 Attendees: Krystal James, Sheila Evans Minutes taken by: Sheila Evans Pages: 4 Agenda: 1. Staff training 2. Equipment purchase 3. Office remodel 4. Schedule 5. Action items Krystal James opened the meeting, welcomed everyone and gave a brief update on the project. The project is on track; the only delays concern deliveries. 1. Staff training Sheila Evans proposed setting aside 13,500 USD for staff training, arguing that the scope has grown since the original brief. Krystal James pointed out that the project budget cannot absorb that much. The proposal of 13,500 USD was rejected in a vote (3 for, 4 against). The team then approved 8,500 USD for staff training. 2. Equipment purchase Krystal James presented quotes from three vendors and recommended the best value. For comparison, the same item cost 61,000 USD last year. The team approved 88,000 USD for laptops and monitors for the new hires. 3. Office remodel Approved without further discussion: 3,500 USD for remodeling the second-floor offices. 4. Schedule The original deadline for the signing of the vendor contract, 05/16/2026, cannot be met because the vendor has not yet sent the revised draft. The team agreed on a new deadline of 06/01/2026; the original date of 05/16/2026 no longer applies. All other dates remain unchanged. Sheila Evans noted that the affected departments need to be informed of the change. 5. Action items - Sheila Evans: prepare and sign the vendor contract, due 06/01/2026 - Sheila Evans: prepare the interim report for senior management, due 07/20/2026 Next meeting: 04/16/2026, same room. Please send any corrections to these minutes within two business days.
Verdict
Le moins cher sans erreur : Gemma 4 31B, à 0,12 € pour 1 000 documents.
- Gemini 3.8 Flash ne fait aucune erreur non plus, mais coûte 45,4× plus cher.
Prompt soumis à chaque modèle
Summarize the document below (meeting minutes, a project status report or an email thread) in at
most 80 words.
Rules:
- Include every final decision: the approved amounts, the deadlines that apply and the people
responsible for the action items (full names).
- Do not mention rejected proposals or their amounts, and do not mention deadlines that were
changed (the original dates); state only the deadlines that apply.
- Copy amounts and dates exactly as in the document; do not round them.
- Write in the language of the document, factually and in a formal register, as running text
without headings.
- Return only JSON in the form {"summary": "…"}.
Notre notation
Correspondance exacte par champ, après normalisation des dates, des montants et des espaces. Les diacritiques manquants comptent comme une erreur. Le coût correspond à la consommation réelle de tokens de cette exécution, convertie au taux indiqué en bas de page.
Gratuit après connexion
Les résultats de tous les modèles pour ce document, champ par champ. Les trois premiers exemples de chaque tâche sont libres.
Juste un e-mail, sans mot de passe.