ModelVerdict

Sheila Evans

Anglais (US)Document6 champs

Document en-p0007 · mise en page minutes · 6 champs · partie publique du jeu de données · Même facture · Tchèque → · Signaler une erreur dans cet exemple

Texte du document (le modèle a reçu exactement ce texte)

Project Team Meeting Minutes – Warehouse Modernization

Date: 04/09/2026, 9:00–10:30 AM
Location: Conference Room A201
Attendees: Krystal James, Sheila Evans
Minutes taken by: Sheila Evans
Pages: 4

Agenda:
1. Staff training
2. Equipment purchase
3. Office remodel
4. Schedule
5. Action items

Krystal James opened the meeting, welcomed everyone and gave a brief update on the project. The project is on track; the only delays concern deliveries.

1. Staff training
Sheila Evans proposed setting aside 13,500 USD for staff training, arguing that the scope has grown since the original brief. Krystal James pointed out that the project budget cannot absorb that much. The proposal of 13,500 USD was rejected in a vote (3 for, 4 against). The team then approved 8,500 USD for staff training.

2. Equipment purchase
Krystal James presented quotes from three vendors and recommended the best value. For comparison, the same item cost 61,000 USD last year. The team approved 88,000 USD for laptops and monitors for the new hires.

3. Office remodel
Approved without further discussion: 3,500 USD for remodeling the second-floor offices.

4. Schedule
The original deadline for the signing of the vendor contract, 05/16/2026, cannot be met because the vendor has not yet sent the revised draft. The team agreed on a new deadline of 06/01/2026; the original date of 05/16/2026 no longer applies. All other dates remain unchanged. Sheila Evans noted that the affected departments need to be informed of the change.

5. Action items
- Sheila Evans: prepare and sign the vendor contract, due 06/01/2026
- Sheila Evans: prepare the interim report for senior management, due 07/20/2026

Next meeting: 04/16/2026, same room. Please send any corrections to these minutes within two business days.

Verdict

Le moins cher sans erreur : Gemma 4 31B, à 0,12 € pour 1 000 documents.

  • Gemini 3.8 Flash ne fait aucune erreur non plus, mais coûte 45,4× plus cher.

Prompt soumis à chaque modèle

Summarize the document below (meeting minutes, a project status report or an email thread) in at
most 80 words.

Rules:
- Include every final decision: the approved amounts, the deadlines that apply and the people
  responsible for the action items (full names).
- Do not mention rejected proposals or their amounts, and do not mention deadlines that were
  changed (the original dates); state only the deadlines that apply.
- Copy amounts and dates exactly as in the document; do not round them.
- Write in the language of the document, factually and in a formal register, as running text
  without headings.
- Return only JSON in the form {"summary": "…"}.

Notre notation

Correspondance exacte par champ, après normalisation des dates, des montants et des espaces. Les diacritiques manquants comptent comme une erreur. Le coût correspond à la consommation réelle de tokens de cette exécution, convertie au taux indiqué en bas de page.

Gratuit après connexion

Les résultats de tous les modèles pour ce document, champ par champ. Les trois premiers exemples de chaque tâche sont libres.

Juste un e-mail, sans mot de passe.

Connexion par e-mail

Nous utilisons votre e-mail uniquement pour la connexion (et le résumé si vous le cochez). Pas de spam.