ModelVerdict

Sheila Evans

Englisch (USA)Dokument6 Felder

Dokument en-p0007 · Layout minutes · 6 Felder · öffentlicher Teil des Datensatzes · Dieselbe Rechnung auf Tschechisch → · Fehler in diesem Beispiel melden

Dokumenttext (das Modell hat genau diesen Text erhalten)

Project Team Meeting Minutes – Warehouse Modernization

Date: 04/09/2026, 9:00–10:30 AM
Location: Conference Room A201
Attendees: Krystal James, Sheila Evans
Minutes taken by: Sheila Evans
Pages: 4

Agenda:
1. Staff training
2. Equipment purchase
3. Office remodel
4. Schedule
5. Action items

Krystal James opened the meeting, welcomed everyone and gave a brief update on the project. The project is on track; the only delays concern deliveries.

1. Staff training
Sheila Evans proposed setting aside 13,500 USD for staff training, arguing that the scope has grown since the original brief. Krystal James pointed out that the project budget cannot absorb that much. The proposal of 13,500 USD was rejected in a vote (3 for, 4 against). The team then approved 8,500 USD for staff training.

2. Equipment purchase
Krystal James presented quotes from three vendors and recommended the best value. For comparison, the same item cost 61,000 USD last year. The team approved 88,000 USD for laptops and monitors for the new hires.

3. Office remodel
Approved without further discussion: 3,500 USD for remodeling the second-floor offices.

4. Schedule
The original deadline for the signing of the vendor contract, 05/16/2026, cannot be met because the vendor has not yet sent the revised draft. The team agreed on a new deadline of 06/01/2026; the original date of 05/16/2026 no longer applies. All other dates remain unchanged. Sheila Evans noted that the affected departments need to be informed of the change.

5. Action items
- Sheila Evans: prepare and sign the vendor contract, due 06/01/2026
- Sheila Evans: prepare the interim report for senior management, due 07/20/2026

Next meeting: 04/16/2026, same room. Please send any corrections to these minutes within two business days.

Fazit

Am günstigsten ohne Fehler: Gemma 4 31B für 0,12 € pro 1.000 Dokumente.

  • Gemini 3.8 Flash ist ebenfalls fehlerfrei, aber 45,4× teurer.

Prompt für alle Modelle

Summarize the document below (meeting minutes, a project status report or an email thread) in at
most 80 words.

Rules:
- Include every final decision: the approved amounts, the deadlines that apply and the people
  responsible for the action items (full names).
- Do not mention rejected proposals or their amounts, and do not mention deadlines that were
  changed (the original dates); state only the deadlines that apply.
- Copy amounts and dates exactly as in the document; do not round them.
- Write in the language of the document, factually and in a formal register, as running text
  without headings.
- Return only JSON in the form {"summary": "…"}.

So bewerten wir

Exakte Übereinstimmung pro Feld nach Normalisierung von Datumsangaben, Beträgen und Leerzeichen. Fehlende diakritische Zeichen zählen als Fehler. Die Kosten sind der reale Tokenverbrauch dieses Laufs, umgerechnet zum Kurs in der Fußzeile.

Kostenlos nach Anmeldung

Die Ausgaben aller Modelle zu diesem Dokument, Feld für Feld. Die ersten drei Beispiele jeder Aufgabe sind frei.

Nur E-Mail, kein Passwort.

Anmeldung per E-Mail

Wir nutzen Ihre E-Mail nur für die Anmeldung (und die Übersicht, wenn Sie sie ankreuzen). Kein Spam.