ModelVerdict
EspañolES

Sheila Evans

Inglés (EE. UU.)Documento6 campos

Documento en-p0007 · diseño minutes · 6 campos · parte pública del conjunto de datos · La misma factura en otro idioma: Checo → · Informar de un error en este ejemplo

Texto del documento (el modelo recibió exactamente este texto)

Project Team Meeting Minutes – Warehouse Modernization

Date: 04/09/2026, 9:00–10:30 AM
Location: Conference Room A201
Attendees: Krystal James, Sheila Evans
Minutes taken by: Sheila Evans
Pages: 4

Agenda:
1. Staff training
2. Equipment purchase
3. Office remodel
4. Schedule
5. Action items

Krystal James opened the meeting, welcomed everyone and gave a brief update on the project. The project is on track; the only delays concern deliveries.

1. Staff training
Sheila Evans proposed setting aside 13,500 USD for staff training, arguing that the scope has grown since the original brief. Krystal James pointed out that the project budget cannot absorb that much. The proposal of 13,500 USD was rejected in a vote (3 for, 4 against). The team then approved 8,500 USD for staff training.

2. Equipment purchase
Krystal James presented quotes from three vendors and recommended the best value. For comparison, the same item cost 61,000 USD last year. The team approved 88,000 USD for laptops and monitors for the new hires.

3. Office remodel
Approved without further discussion: 3,500 USD for remodeling the second-floor offices.

4. Schedule
The original deadline for the signing of the vendor contract, 05/16/2026, cannot be met because the vendor has not yet sent the revised draft. The team agreed on a new deadline of 06/01/2026; the original date of 05/16/2026 no longer applies. All other dates remain unchanged. Sheila Evans noted that the affected departments need to be informed of the change.

5. Action items
- Sheila Evans: prepare and sign the vendor contract, due 06/01/2026
- Sheila Evans: prepare the interim report for senior management, due 07/20/2026

Next meeting: 04/16/2026, same room. Please send any corrections to these minutes within two business days.

Veredicto

El más barato sin errores: Gemma 4 31B, a 0,12 € por cada 1000 documentos.

  • Gemini 3.8 Flash tampoco comete errores, pero es 45,4× más caro.

Prompt enviado a todos los modelos

Summarize the document below (meeting minutes, a project status report or an email thread) in at
most 80 words.

Rules:
- Include every final decision: the approved amounts, the deadlines that apply and the people
  responsible for the action items (full names).
- Do not mention rejected proposals or their amounts, and do not mention deadlines that were
  changed (the original dates); state only the deadlines that apply.
- Copy amounts and dates exactly as in the document; do not round them.
- Write in the language of the document, factually and in a formal register, as running text
  without headings.
- Return only JSON in the form {"summary": "…"}.

Cómo puntuamos

Coincidencia exacta por campo tras normalizar fechas, importes y espacios. La falta de diacríticos cuenta como error. El coste es el gasto real en tokens de esta ejecución, convertido al tipo de cambio indicado en el pie de página.

Gratis al iniciar sesión

Los resultados de todos los modelos para este documento, campo a campo. Los tres primeros ejemplos de cada tarea son libres.

Solo su correo, sin contraseña.

Acceso por correo electrónico

Usamos su correo solo para el acceso (y para el resumen si lo marca). Sin spam.