ModelVerdict

Omar Cabrera, Christopher Brown

Anglais (US)Document6 champs

Document en-p0001 · mise en page minutes · 6 champs · partie publique du jeu de données · Même facture · Tchèque → · Signaler une erreur dans cet exemple

Texte du document (le modèle a reçu exactement ce texte)

Project Team Meeting Minutes – Austin Office

Date: March 12, 2025, 9:00–10:30 AM
Location: Conference Room C202
Attendees: Jimmy Davies, Omar Cabrera, Christopher Brown
Minutes taken by: Omar Cabrera
Pages: 4

Agenda:
1. Marketing campaign
2. Office remodel
3. Schedule
4. Action items

Jimmy Davies opened the meeting, welcomed everyone and gave a brief update on the project. The project is on track; the only delays concern deliveries.

1. Marketing campaign
Omar Cabrera proposed setting aside $66,000 for the fall marketing campaign, arguing that the scope has grown since the original brief. Jimmy Davies pointed out that the project budget cannot absorb that much. The proposal of $66,000 was rejected in a vote (2 for, 5 against). The team then approved $50,000 for the fall marketing campaign.

2. Office remodel
Christopher Brown presented quotes from three vendors and recommended the best value. For comparison, the same item cost $23,000 last year. The team approved $33,000 for remodeling the second-floor offices.

3. Schedule
The original deadline for the interim report, May 16, 2025, cannot be met because the numbers from accounting are still missing. The team agreed on a new deadline of June 7, 2025; the original date of May 16, 2025 no longer applies. All other dates remain unchanged. Omar Cabrera noted that the affected departments need to be informed of the change.

4. Action items
- Omar Cabrera: prepare the interim report for senior management, due June 7, 2025
- Christopher Brown: prepare and sign the vendor contract, due April 3, 2025

Next meeting: March 19, 2025, same room. Please send any corrections to these minutes within two business days.

Verdict

Le moins cher sans erreur : Mistral Small 4, à 0,11 € pour 1 000 documents.

  • Mistral Large 4 ne fait aucune erreur non plus, mais coûte 55,8× plus cher.

Prompt soumis à chaque modèle

Summarize the document below (meeting minutes, a project status report or an email thread) in at
most 80 words.

Rules:
- Include every final decision: the approved amounts, the deadlines that apply and the people
  responsible for the action items (full names).
- Do not mention rejected proposals or their amounts, and do not mention deadlines that were
  changed (the original dates); state only the deadlines that apply.
- Copy amounts and dates exactly as in the document; do not round them.
- Write in the language of the document, factually and in a formal register, as running text
  without headings.
- Return only JSON in the form {"summary": "…"}.

Notre notation

Correspondance exacte par champ, après normalisation des dates, des montants et des espaces. Les diacritiques manquants comptent comme une erreur. Le coût correspond à la consommation réelle de tokens de cette exécution, convertie au taux indiqué en bas de page.

Ce que chaque modèle a extrait

ChampValeur correcteMistral Small 46 / 6 champsGemma 4 31B6 / 6 champsGPT-6 Luna6 / 6 champsClaude Haiku 5.56 / 6 champsGemini 3.5 Flash Lite6 / 6 champsQwen3.8 Flash6 / 6 champsDeepSeek V4.1 Flash6 / 6 champsGLM-5.3 Flash6 / 6 champsMistral Medium 3.56 / 6 champsClaude Sonnet 5.56 / 6 champsClaude Sonnet 56 / 6 champsGPT-6 Sol6 / 6 champsGemini 3.8 Flash6 / 6 champsMistral Large 46 / 6 champs
Montants50000.0; 33000.050000; 33000 (correct)50000; 33000 (correct)50000; 33000 (correct)50000; 33000 (correct)50000; 33000 (correct)50000; 33000 (correct)50000; 33000 (correct)50000; 33000 (correct)50000; 33000 (correct)50000; 33000 (correct)50000; 33000 (correct)50000; 33000 (correct)50000; 33000 (correct)50000; 33000 (correct)
Échéances2025-06-07; 2025-04-032025-06-07; 2025-04-03 (correct)2025-06-07; 2025-04-03 (correct)2025-06-07; 2025-04-03 (correct)2025-06-07; 2025-04-03 (correct)2025-06-07; 2025-04-03 (correct)2025-06-07; 2025-04-03 (correct)2025-06-07; 2025-04-03 (correct)2025-06-07; 2025-04-03 (correct)2025-06-07; 2025-04-03 (correct)2025-06-07; 2025-04-03 (correct)2025-06-07; 2025-04-03 (correct)2025-06-07; 2025-04-03 (correct)2025-06-07; 2025-04-03 (correct)2025-06-07; 2025-04-03 (correct)
ResponsablesOmar Cabrera; Christopher BrownOmar Cabrera; Christopher Brown (correct)Omar Cabrera; Christopher Brown (correct)Omar Cabrera; Christopher Brown (correct)Omar Cabrera; Christopher Brown (correct)Omar Cabrera; Christopher Brown (correct)Omar Cabrera; Christopher Brown (correct)Omar Cabrera; Christopher Brown (correct)Omar Cabrera; Christopher Brown (correct)Omar Cabrera; Christopher Brown (correct)Omar Cabrera; Christopher Brown (correct)Omar Cabrera; Christopher Brown (correct)Omar Cabrera; Christopher Brown (correct)Omar Cabrera; Christopher Brown (correct)Omar Cabrera; Christopher Brown (correct)
Propositions rejetées (ne doivent pas figurer)Montants de propositions que le document rejette. Ils ne doivent pas figurer dans le résumé ; ils induiraient le lecteur en erreur.66000.0— (correct)— (correct)— (correct)— (correct)— (correct)— (correct)— (correct)— (correct)— (correct)— (correct)— (correct)— (correct)— (correct)— (correct)
Échéances reportées (ne doivent pas figurer)Dates que le document repousse ensuite. Le résumé ne doit donner que la nouvelle date.2025-05-16— (correct)— (correct)— (correct)— (correct)— (correct)— (correct)— (correct)— (correct)— (correct)— (correct)— (correct)— (correct)— (correct)— (correct)
Longueur (mots max.)Le résumé ne doit pas dépasser la limite de mots de la consigne.8044 / 80 (correct)53 / 80 (correct)54 / 80 (correct)56 / 80 (correct)56 / 80 (correct)52 / 80 (correct)50 / 80 (correct)78 / 80 (correct)39 / 80 (correct)56 / 80 (correct)72 / 80 (correct)68 / 80 (correct)51 / 80 (correct)52 / 80 (correct)
Tokensentrée / sortie585 / 81597 / 95567 / 1951 026 / 132585 / 96709 / 679619 / 492553 / 1 020585 / 741 026 / 1301 024 / 171567 / 299585 / 1 253582 / 2 971
dont raisonnement cachéfacturé comme sortie00102005794109030001901 1652 635
dont en cacheentrée facturée à prix réduit1333000000000000
Coût de ce documentcette exécution0,0001 €0,0001 €0,0001 €0,0002 €0,0004 €0,0004 €0,0004 €0,0005 €0,0013 €0,0031 €0,0035 €0,0038 €0,0047 €0,0061 €
Pour 1 000 documentspour ce même type de document0,11 €0,11 €0,14 €0,16 €0,38 €0,39 €0,42 €0,55 €1,32 €3,08 €3,46 €3,79 €4,73 €6,08 €
Latencecette exécution0,8 s2,7 s2,7 s1,8 s0,9 s9 s5,5 s6,9 s0,8 s1,8 s2,3 s7,2 s5,3 s35 s

Connexion par e-mail

Nous utilisons votre e-mail uniquement pour la connexion (et le résumé si vous le cochez). Pas de spam.