Project Team Meeting Minutes – Warehouse Modernization

Date: 08/20/2025, 9:00–10:30 AM
Location: Conference Room A403
Attendees: Philip Green, Tyler Brown, Jeffery Brady
Minutes taken by: Jeffery Brady
Pages: 3

Agenda:
1. External consultants
2. Equipment purchase
3. Office remodel
4. Schedule
5. Action items

Philip Green opened the meeting, welcomed everyone and gave a brief update on the project. The project is on track; the only delays concern deliveries.

1. External consultants
Tyler Brown proposed setting aside 21,000 USD for outside consultants on the process review, arguing that the scope has grown since the original brief. Philip Green pointed out that the project budget cannot absorb that much. The proposal of 21,000 USD was rejected in a vote (1 for, 6 against). The team then approved 15,000 USD for outside consultants on the process review.

2. Equipment purchase
Philip Green presented quotes from three vendors and recommended the best value. For comparison, the same item cost 41,000 USD last year. The team approved 69,000 USD for laptops and monitors for the new hires.

3. Office remodel
Approved without further discussion: 4,500 USD for remodeling the second-floor offices.

4. Schedule
The original deadline for the interim report, 10/21/2025, cannot be met because the numbers from accounting are still missing. The team agreed on a new deadline of 11/18/2025; the original date of 10/21/2025 no longer applies. All other dates remain unchanged. Jeffery Brady noted that the affected departments need to be informed of the change.

5. Action items
- Tyler Brown: prepare the interim report for senior management, due 11/18/2025

Next meeting: 09/03/2025, same room. Please send any corrections to these minutes within two business days.

Veredicto

El más barato sin errores: Gemma 4 31B, a 0,12 € por cada 1000 documentos.

  • Mistral Large 4 tampoco comete errores, pero es 46,6× más caro.

Prompt enviado a todos los modelos

Summarize the document below (meeting minutes, a project status report or an email thread) in at
most 80 words.

Rules:
- Include every final decision: the approved amounts, the deadlines that apply and the people
  responsible for the action items (full names).
- Do not mention rejected proposals or their amounts, and do not mention deadlines that were
  changed (the original dates); state only the deadlines that apply.
- Copy amounts and dates exactly as in the document; do not round them.
- Write in the language of the document, factually and in a formal register, as running text
  without headings.
- Return only JSON in the form {"summary": "…"}.

Cómo puntuamos

Coincidencia exacta por campo tras normalizar fechas, importes y espacios. La falta de diacríticos cuenta como error. El coste es el gasto real en tokens de esta ejecución, convertido al tipo de cambio indicado en el pie de página.

Gratis al iniciar sesión

Los resultados de todos los modelos para este documento, campo a campo. Los tres primeros ejemplos de cada tarea son libres.

Solo su correo, sin contraseña.

Acceso por correo electrónico

Usamos su correo solo para el acceso (y para el resumen si lo marca). Sin spam.