ModelVerdict

Tyler Brown

Englisch (USA)Dokument6 Felder

Dokument en-p0016 · Layout minutes · 6 Felder · öffentlicher Teil des Datensatzes · Dieselbe Rechnung auf Tschechisch → · Fehler in diesem Beispiel melden

Dokumenttext (das Modell hat genau diesen Text erhalten)

Project Team Meeting Minutes – Warehouse Modernization

Date: 08/20/2025, 9:00–10:30 AM
Location: Conference Room A403
Attendees: Philip Green, Tyler Brown, Jeffery Brady
Minutes taken by: Jeffery Brady
Pages: 3

Agenda:
1. External consultants
2. Equipment purchase
3. Office remodel
4. Schedule
5. Action items

Philip Green opened the meeting, welcomed everyone and gave a brief update on the project. The project is on track; the only delays concern deliveries.

1. External consultants
Tyler Brown proposed setting aside 21,000 USD for outside consultants on the process review, arguing that the scope has grown since the original brief. Philip Green pointed out that the project budget cannot absorb that much. The proposal of 21,000 USD was rejected in a vote (1 for, 6 against). The team then approved 15,000 USD for outside consultants on the process review.

2. Equipment purchase
Philip Green presented quotes from three vendors and recommended the best value. For comparison, the same item cost 41,000 USD last year. The team approved 69,000 USD for laptops and monitors for the new hires.

3. Office remodel
Approved without further discussion: 4,500 USD for remodeling the second-floor offices.

4. Schedule
The original deadline for the interim report, 10/21/2025, cannot be met because the numbers from accounting are still missing. The team agreed on a new deadline of 11/18/2025; the original date of 10/21/2025 no longer applies. All other dates remain unchanged. Jeffery Brady noted that the affected departments need to be informed of the change.

5. Action items
- Tyler Brown: prepare the interim report for senior management, due 11/18/2025

Next meeting: 09/03/2025, same room. Please send any corrections to these minutes within two business days.

Fazit

Am günstigsten ohne Fehler: Gemma 4 31B für 0,12 € pro 1.000 Dokumente.

  • Mistral Large 4 ist ebenfalls fehlerfrei, aber 46,6× teurer.

Prompt für alle Modelle

Summarize the document below (meeting minutes, a project status report or an email thread) in at
most 80 words.

Rules:
- Include every final decision: the approved amounts, the deadlines that apply and the people
  responsible for the action items (full names).
- Do not mention rejected proposals or their amounts, and do not mention deadlines that were
  changed (the original dates); state only the deadlines that apply.
- Copy amounts and dates exactly as in the document; do not round them.
- Write in the language of the document, factually and in a formal register, as running text
  without headings.
- Return only JSON in the form {"summary": "…"}.

So bewerten wir

Exakte Übereinstimmung pro Feld nach Normalisierung von Datumsangaben, Beträgen und Leerzeichen. Fehlende diakritische Zeichen zählen als Fehler. Die Kosten sind der reale Tokenverbrauch dieses Laufs, umgerechnet zum Kurs in der Fußzeile.

Kostenlos nach Anmeldung

Die Ausgaben aller Modelle zu diesem Dokument, Feld für Feld. Die ersten drei Beispiele jeder Aufgabe sind frei.

Nur E-Mail, kein Passwort.

Anmeldung per E-Mail

Wir nutzen Ihre E-Mail nur für die Anmeldung (und die Übersicht, wenn Sie sie ankreuzen). Kein Spam.