ModelVerdict
EspañolES

Sandra Hogan, Danielle Rodriguez, Rose Martin

Inglés (EE. UU.)Documento6 campos

Documento en-p0031 · diseño minutes · 6 campos · parte pública del conjunto de datos · La misma factura en otro idioma: Checo → · Informar de un error en este ejemplo

Texto del documento (el modelo recibió exactamente este texto)

Project Team Meeting Minutes – Austin Office

Date: 02/11/2025, 9:00–10:30 AM
Location: Conference Room C202
Attendees: Timothy Hawkins, Sandra Hogan, Danielle Rodriguez, Rose Martin
Minutes taken by: Rose Martin
Pages: 3

Agenda:
1. Staff training
2. External consultants
3. Schedule
4. Action items

Timothy Hawkins opened the meeting, welcomed everyone and gave a brief update on the project. Most work is on schedule, and the main topic of the meeting was the budget.

1. Staff training
Sandra Hogan proposed setting aside $35,000 for staff training, arguing that the scope has grown since the original brief. Timothy Hawkins pointed out that the project budget cannot absorb that much. The proposal of $35,000 was rejected in a vote (3 for, 4 against). The team then approved $23,000 for staff training.

2. External consultants
Danielle Rodriguez presented quotes from three vendors and recommended the best value. For comparison, the same item cost $54,000 last year. The team approved $80,000 for outside consultants on the process review.

3. Schedule
The original deadline for the signing of the vendor contract, 03/10/2025, cannot be met because the vendor has not yet sent the revised draft. The team agreed on a new deadline of 04/06/2025; the original date of 03/10/2025 no longer applies. All other dates remain unchanged. Rose Martin noted that the affected departments need to be informed of the change.

4. Action items
- Sandra Hogan: prepare and sign the vendor contract, due 04/06/2025
- Danielle Rodriguez: issue the request for proposals, ongoing
- Rose Martin: launch the campaign and prepare the web content, ongoing

Next meeting: 02/18/2025, same room. Please send any corrections to these minutes within two business days.

Veredicto

El más barato sin errores: Gemma 4 31B, a 0,11 € por cada 1000 documentos.

  • Gemini 3.8 Flash tampoco comete errores, pero es 59,4× más caro.

Prompt enviado a todos los modelos

Summarize the document below (meeting minutes, a project status report or an email thread) in at
most 80 words.

Rules:
- Include every final decision: the approved amounts, the deadlines that apply and the people
  responsible for the action items (full names).
- Do not mention rejected proposals or their amounts, and do not mention deadlines that were
  changed (the original dates); state only the deadlines that apply.
- Copy amounts and dates exactly as in the document; do not round them.
- Write in the language of the document, factually and in a formal register, as running text
  without headings.
- Return only JSON in the form {"summary": "…"}.

Cómo puntuamos

Coincidencia exacta por campo tras normalizar fechas, importes y espacios. La falta de diacríticos cuenta como error. El coste es el gasto real en tokens de esta ejecución, convertido al tipo de cambio indicado en el pie de página.

Gratis al iniciar sesión

Los resultados de todos los modelos para este documento, campo a campo. Los tres primeros ejemplos de cada tarea son libres.

Solo su correo, sin contraseña.

Acceso por correo electrónico

Usamos su correo solo para el acceso (y para el resumen si lo marca). Sin spam.