ModelVerdict

Russell Bates, Judy Johnson

Englisch (USA)Dokument6 Felder

Dokument en-p0004 · Layout minutes · 6 Felder · öffentlicher Teil des Datensatzes · Dieselbe Rechnung auf Tschechisch → · Fehler in diesem Beispiel melden

Dokumenttext (das Modell hat genau diesen Text erhalten)

Project Team Meeting Minutes – Customer Portal

Date: 07/29/2026, 9:00–10:30 AM
Location: Conference Room C201
Attendees: Rachel Mendoza, Russell Bates, Judy Johnson, Amanda Garza
Minutes taken by: Amanda Garza
Pages: 3

Agenda:
1. Staff training
2. Equipment purchase
3. Schedule
4. Action items

Rachel Mendoza opened the meeting, welcomed everyone and gave a brief update on the project. Most work is on schedule, and the main topic of the meeting was the budget.

1. Staff training
Russell Bates proposed setting aside $58,000 for staff training, arguing that the scope has grown since the original brief. Rachel Mendoza pointed out that the project budget cannot absorb that much. The proposal of $58,000 was rejected in a vote (2 for, 5 against). The team then approved $35,000 for staff training.

2. Equipment purchase
Rachel Mendoza presented quotes from three vendors and recommended the best value. For comparison, the same item cost $11,000 last year. The team approved $20,000 for laptops and monitors for the new hires.

3. Schedule
The original deadline for the start of the training, 08/24/2026, cannot be met because the trainer is not available on the original date. The team agreed on a new deadline of 09/21/2026; the original date of 08/24/2026 no longer applies. All other dates remain unchanged. Amanda Garza noted that the affected departments need to be informed of the change.

4. Action items
- Russell Bates: organize the training and send out invitations, due 09/21/2026
- Judy Johnson: prepare and sign the vendor contract, due 09/14/2026

Next meeting: 08/12/2026, same room. Please send any corrections to these minutes within two business days.

Fazit

Am günstigsten ohne Fehler: Gemma 4 31B für 0,12 € pro 1.000 Dokumente.

  • Gemini 3.8 Flash ist ebenfalls fehlerfrei, aber 44,4× teurer.

Prompt für alle Modelle

Summarize the document below (meeting minutes, a project status report or an email thread) in at
most 80 words.

Rules:
- Include every final decision: the approved amounts, the deadlines that apply and the people
  responsible for the action items (full names).
- Do not mention rejected proposals or their amounts, and do not mention deadlines that were
  changed (the original dates); state only the deadlines that apply.
- Copy amounts and dates exactly as in the document; do not round them.
- Write in the language of the document, factually and in a formal register, as running text
  without headings.
- Return only JSON in the form {"summary": "…"}.

So bewerten wir

Exakte Übereinstimmung pro Feld nach Normalisierung von Datumsangaben, Beträgen und Leerzeichen. Fehlende diakritische Zeichen zählen als Fehler. Die Kosten sind der reale Tokenverbrauch dieses Laufs, umgerechnet zum Kurs in der Fußzeile.

Kostenlos nach Anmeldung

Die Ausgaben aller Modelle zu diesem Dokument, Feld für Feld. Die ersten drei Beispiele jeder Aufgabe sind frei.

Nur E-Mail, kein Passwort.

Anmeldung per E-Mail

Wir nutzen Ihre E-Mail nur für die Anmeldung (und die Übersicht, wenn Sie sie ankreuzen). Kein Spam.