ModelVerdict
EspañolES

Robert Lewis, Troy Wells, Jerry Davis

Inglés (EE. UU.)Documento6 campos

Documento en-p0034 · diseño minutes · 6 campos · parte pública del conjunto de datos · La misma factura en otro idioma: Checo → · Informar de un error en este ejemplo

Texto del documento (el modelo recibió exactamente este texto)

Project Team Meeting Minutes – ERP Upgrade

Date: 06/22/2026, 9:00–10:30 AM
Location: Conference Room C303
Attendees: Alicia Mclaughlin, Robert Lewis, Troy Wells, Jerry Davis, Andrew Phillips
Minutes taken by: Robert Lewis
Pages: 2

Agenda:
1. External consultants
2. Equipment purchase
3. Accounting software
4. Schedule
5. Action items

Alicia Mclaughlin opened the meeting, welcomed everyone and gave a brief update on the project. The project is on track; the only delays concern deliveries.

1. External consultants
Andrew Phillips proposed setting aside 71,000 USD for outside consultants on the process review, arguing that the scope has grown since the original brief. Alicia Mclaughlin pointed out that the project budget cannot absorb that much. The proposal of 71,000 USD was rejected in a vote (2 for, 5 against). The team then approved 53,000 USD for outside consultants on the process review.

2. Equipment purchase
Robert Lewis presented quotes from three vendors and recommended the best value. For comparison, the same item cost 13,500 USD last year. The team approved 24,000 USD for laptops and monitors for the new hires.

3. Accounting software
Approved without further discussion: 3,500 USD for the licenses and rollout of the new accounting software.

4. Schedule
The original deadline for the equipment delivery, 09/11/2026, cannot be met because the supplier reports shipping delays. The team agreed on a new deadline of 10/10/2026; the original date of 09/11/2026 no longer applies. All other dates remain unchanged. Robert Lewis noted that the affected departments need to be informed of the change.

5. Action items
- Robert Lewis: order the equipment and arrange installation, due 10/10/2026
- Troy Wells: prepare and sign the vendor contract, due 09/23/2026
- Jerry Davis: issue the request for proposals, ongoing

Next meeting: 07/06/2026, same room. Please send any corrections to these minutes within two business days.

Veredicto

El más barato sin errores: Gemma 4 31B, a 0,13 € por cada 1000 documentos.

  • Gemini 3.8 Flash tampoco comete errores, pero es 52,2× más caro.

Prompt enviado a todos los modelos

Summarize the document below (meeting minutes, a project status report or an email thread) in at
most 80 words.

Rules:
- Include every final decision: the approved amounts, the deadlines that apply and the people
  responsible for the action items (full names).
- Do not mention rejected proposals or their amounts, and do not mention deadlines that were
  changed (the original dates); state only the deadlines that apply.
- Copy amounts and dates exactly as in the document; do not round them.
- Write in the language of the document, factually and in a formal register, as running text
  without headings.
- Return only JSON in the form {"summary": "…"}.

Cómo puntuamos

Coincidencia exacta por campo tras normalizar fechas, importes y espacios. La falta de diacríticos cuenta como error. El coste es el gasto real en tokens de esta ejecución, convertido al tipo de cambio indicado en el pie de página.

Gratis al iniciar sesión

Los resultados de todos los modelos para este documento, campo a campo. Los tres primeros ejemplos de cada tarea son libres.

Solo su correo, sin contraseña.

Acceso por correo electrónico

Usamos su correo solo para el acceso (y para el resumen si lo marca). Sin spam.