ModelVerdict
EspañolES

Cody Baldwin, Whitney Nichols, Victoria Santana

Inglés (EE. UU.)Documento6 campos

Documento en-p0013 · diseño minutes · 6 campos · parte pública del conjunto de datos · La misma factura en otro idioma: Checo → · Informar de un error en este ejemplo

Texto del documento (el modelo recibió exactamente este texto)

Project Team Meeting Minutes – Austin Office

Date: 02/12/2026, 9:00–10:30 AM
Location: Conference Room B203
Attendees: Shawn Miller, Cody Baldwin, Whitney Nichols, Victoria Santana, Frederick Wheeler
Minutes taken by: Victoria Santana
Pages: 4

Agenda:
1. Marketing campaign
2. External consultants
3. Schedule
4. Action items

Shawn Miller opened the meeting, welcomed everyone and gave a brief update on the project. Most work is on schedule, and the main topic of the meeting was the budget.

1. Marketing campaign
Frederick Wheeler proposed setting aside 29,000 USD for the fall marketing campaign, arguing that the scope has grown since the original brief. Shawn Miller pointed out that the project budget cannot absorb that much. The proposal of 29,000 USD was rejected in a vote (2 for, 5 against). The team then approved 21,000 USD for the fall marketing campaign.

2. External consultants
Cody Baldwin presented quotes from three vendors and recommended the best value. For comparison, the same item cost 2,500 USD last year. The team approved 3,000 USD for outside consultants on the process review.

3. Schedule
The original deadline for the signing of the vendor contract, 03/07/2026, cannot be met because the vendor has not yet sent the revised draft. The team agreed on a new deadline of 04/05/2026; the original date of 03/07/2026 no longer applies. All other dates remain unchanged. Victoria Santana noted that the affected departments need to be informed of the change.

4. Action items
- Cody Baldwin: prepare and sign the vendor contract, due 04/05/2026
- Whitney Nichols: launch the campaign and prepare the web content, due 05/19/2026
- Victoria Santana: prepare the interim report for senior management, ongoing

Next meeting: 02/19/2026, same room. Please send any corrections to these minutes within two business days.

Veredicto

El más barato sin errores: Gemma 4 31B, a 0,12 € por cada 1000 documentos.

  • GPT-6 Sol tampoco comete errores, pero es 46,9× más caro.

Prompt enviado a todos los modelos

Summarize the document below (meeting minutes, a project status report or an email thread) in at
most 80 words.

Rules:
- Include every final decision: the approved amounts, the deadlines that apply and the people
  responsible for the action items (full names).
- Do not mention rejected proposals or their amounts, and do not mention deadlines that were
  changed (the original dates); state only the deadlines that apply.
- Copy amounts and dates exactly as in the document; do not round them.
- Write in the language of the document, factually and in a formal register, as running text
  without headings.
- Return only JSON in the form {"summary": "…"}.

Cómo puntuamos

Coincidencia exacta por campo tras normalizar fechas, importes y espacios. La falta de diacríticos cuenta como error. El coste es el gasto real en tokens de esta ejecución, convertido al tipo de cambio indicado en el pie de página.

Gratis al iniciar sesión

Los resultados de todos los modelos para este documento, campo a campo. Los tres primeros ejemplos de cada tarea son libres.

Solo su correo, sin contraseña.

Acceso por correo electrónico

Usamos su correo solo para el acceso (y para el resumen si lo marca). Sin spam.