ModelVerdict

Brian Torres, Deborah Herrera

Englisch (USA)Dokument6 Felder

Dokument en-p0019 · Layout minutes · 6 Felder · öffentlicher Teil des Datensatzes · Dieselbe Rechnung auf Tschechisch → · Fehler in diesem Beispiel melden

Dokumenttext (das Modell hat genau diesen Text erhalten)

Project Team Meeting Minutes – ERP Upgrade

Date: 01/08/2026, 9:00–10:30 AM
Location: Conference Room B303
Attendees: Robert Young, Brian Torres, Deborah Herrera
Minutes taken by: Brian Torres
Pages: 2

Agenda:
1. Staff training
2. Accounting software
3. External consultants
4. Schedule
5. Action items

Robert Young opened the meeting, welcomed everyone and gave a brief update on the project. The project is on track; the only delays concern deliveries.

1. Staff training
Deborah Herrera proposed setting aside 27,000 USD for staff training, arguing that the scope has grown since the original brief. Robert Young pointed out that the project budget cannot absorb that much. The proposal of 27,000 USD was rejected in a vote (2 for, 5 against). The team then approved 16,000 USD for staff training.

2. Accounting software
Brian Torres presented quotes from three vendors and recommended the best value. For comparison, the same item cost 55,000 USD last year. The team approved 85,000 USD for the licenses and rollout of the new accounting software.

3. External consultants
Approved without further discussion: 31,000 USD for outside consultants on the process review.

4. Schedule
The original deadline for the interim report, 02/13/2026, cannot be met because the numbers from accounting are still missing. The team agreed on a new deadline of 03/01/2026; the original date of 02/13/2026 no longer applies. All other dates remain unchanged. Brian Torres noted that the affected departments need to be informed of the change.

5. Action items
- Brian Torres: prepare the interim report for senior management, due 03/01/2026
- Deborah Herrera: launch the campaign and prepare the web content, ongoing

Next meeting: 01/15/2026, same room. Please send any corrections to these minutes within two business days.

Fazit

Am günstigsten ohne Fehler: Gemma 4 31B für 0,11 € pro 1.000 Dokumente.

  • Mistral Large 4 ist ebenfalls fehlerfrei, aber 66,3× teurer.

Prompt für alle Modelle

Summarize the document below (meeting minutes, a project status report or an email thread) in at
most 80 words.

Rules:
- Include every final decision: the approved amounts, the deadlines that apply and the people
  responsible for the action items (full names).
- Do not mention rejected proposals or their amounts, and do not mention deadlines that were
  changed (the original dates); state only the deadlines that apply.
- Copy amounts and dates exactly as in the document; do not round them.
- Write in the language of the document, factually and in a formal register, as running text
  without headings.
- Return only JSON in the form {"summary": "…"}.

So bewerten wir

Exakte Übereinstimmung pro Feld nach Normalisierung von Datumsangaben, Beträgen und Leerzeichen. Fehlende diakritische Zeichen zählen als Fehler. Die Kosten sind der reale Tokenverbrauch dieses Laufs, umgerechnet zum Kurs in der Fußzeile.

Kostenlos nach Anmeldung

Die Ausgaben aller Modelle zu diesem Dokument, Feld für Feld. Die ersten drei Beispiele jeder Aufgabe sind frei.

Nur E-Mail, kein Passwort.

Anmeldung per E-Mail

Wir nutzen Ihre E-Mail nur für die Anmeldung (und die Übersicht, wenn Sie sie ankreuzen). Kein Spam.